UPM Waste Paper Depot

Location:Shotton, Deeside, Flintshire

Principal Contractor: Eric Wright Construction

Engineer

Engineer: Leach Structural Steelwork Design and Build


Engineer

Disciplines Undertaken:
Structural Steelwork, Metal Decking, Precast Stairs, Cladding


Tonnage

Tonnage: 400


Cost

Value: £1,300,000


An extensive machine hall with storage bays for incoming materials were constructed. The project incorporated an externally elevated conveyor gantry of 100m to link to the existing factory.

There was also extensive cladding to roof and walls covering 9,000m2 of roof cladding and 4,000m2 of wall cladding.

UPM Waste Paper Depot UPM Waste Paper Depot UPM Waste Paper Depot UPM Waste Paper Depot UPM Waste Paper Depot UPM Waste Paper Depot UPM Waste Paper Depot UPM Waste Paper Depot UPM Waste Paper Depot UPM Waste Paper Depot
  • UPM Waste Paper Depot
  • UPM Waste Paper Depot
  • UPM Waste Paper Depot
  • UPM Waste Paper Depot
  • UPM Waste Paper Depot
  • UPM Waste Paper Depot
  • UPM Waste Paper Depot
  • UPM Waste Paper Depot
  • UPM Waste Paper Depot
  • UPM Waste Paper Depot